Reports
This page has been archived on the Web
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Parks Canada's Departmental Performance Reports
ERRATUM
Subsequent to tabling in Parliament and online publication of the 2013-14 Departmental Performance Report, the following transcription errors were noted in the French PDF version of the report:
Section 1: Budgetary Performance Summary for Strategic Outcome(s) and Program(s) Table
For Heritage Resources Conservation, the 2013-14 Main Estimates should have read $157,140,717 instead of $157,193,527.
For Visitor Experience, the 2012-13 Actual Spending should have read $239,572,389 instead of $239,572.
For Townsite and Throughway Infrastructure,
- the 2013-14 Total Authorities available for use should have read $164,264,871 instead of $729,743,248;
- the 2013-14 Actual Spending should have read $118,681,423 instead of $594,650,040;
- the 2012-13 Actual Spending should have read $91,782,776 instead of $545,000,849; and
- the 2011-12 Actual Spending should have read $104,365,103 instead of $593,071,073.
Section II: Analysis of Program(s) by Strategic Outcome
Financial Resources Table for Sub-Program 1.1.3 – The table headings should have read:
- "Dépenses prévues 2013-2014" instead of "Prévu 2013-2014";
- "Dépenses réelles 2013-2014" instead of "Réel 2013-2014"; and
- "Écart (dépenses réelles moins dépenses prévues) 2013-2014" instead of "Écart (nombre réel moins nombre prévu) 2013-2014".
Financial Resources Table for Sub-Program 1.2
- The first table heading should have read "Budget principal des dépenses 2013-2014" instead of "Total des dépenses budgétaires 2013-2014".
- The fiscal year in the second, third and fourth table headings should have read "2013-2014" instead of "2013-14".
- The last table heading should have read "Écart (dépenses réelles moins dépenses prévues) 2013-2014" instead of "Écart (nombre réel moins nombre prévu) 2013-14".
Variance Explanation for Sub-Program 1.5.3 – An "s" has been added to the word "navigable" in the first sentence.
Human Resources Table for Internal Services – The table headings should have read:
- "Prévu 2013-2014" instead of "2013-14 Planned";
- "Réel 2013-2014" instead of "2013-14 Actual"; and
- "Écart (nombre réel moins nombre prévu) 2013-2014 " instead of "2013-14 Difference (actual minus planned)".
The French PDF version of the 2013-14 Departmental Performance Report has been revised to include these corrections.
Return to Parks Canada Agency's Departmental Performance Reports
- Date modified :